ITcon papers tagged with: time

2018 Fayed R A, Ezeldin A S
Simulation and optimization model for electrical substation construction
ITcon Vol. 23, pg. 215-242, http://www.itcon.org/2018/11
2016 Alshibani A, Moselhi O
Productivity based method for forecasting cost & time of earthmoving operations using sampling GPS data
ITcon Vol. 21, pg. 39-56, http://www.itcon.org/2016/3