Fayed R A, Ezeldin A S Simulation and optimization model for electrical substation construction ITcon Vol. 23, pg. 215-242, http://www.itcon.org/2018/11 |
2016 |
Alshibani A, Moselhi O Productivity based method for forecasting cost & time of earthmoving operations using sampling GPS data ITcon Vol. 21, pg. 39-56, http://www.itcon.org/2016/3 |
2010 |
Becerik-Gerber B, Rice S The perceived value of building information modeling in the U.S. building industry ITcon Vol. 15, pg. 185-201, http://www.itcon.org/2010/15 |