ITcon papers authored by: Moselhi

2022 Bhatia A P S, Han SH, Moselhi O
A simulation-based statistical method for planning modular construction manufacturing
ITcon Vol. 27, pg. 130-144, http://www.itcon.org/2022/7
2022 Mohamed B, Moselhi O
Conceptual estimation of construction duration and cost of public highway projects
ITcon Vol. 27, pg. 595-618, http://www.itcon.org/2022/29
2022 Bardareh H, Moselhi O
An integrated RFID–UWB method for indoor localization of materials in construction
ITcon Vol. 27, pg. 642-661, http://www.itcon.org/2022/32
2022 Omar A, Moselhi O
Hybrid feature selection framework for predicting bridge deck conditions
ITcon Vol. 27, pg. 1028-1041, http://www.itcon.org/2022/50
2020 Moselhi O, Roghabadi M A
Risk quantification using fuzzy-based Monte Carlo simulation
ITcon Vol. 25, pg. 87-98, http://www.itcon.org/2020/5
2018 Salem A, Salah A, Moselhi O
Fuzzy-based configuration of automated data acquisition systems for earthmoving operations
ITcon Vol. 23, pg. 122-137, http://www.itcon.org/2018/6
2016 Alshibani A, Moselhi O
Productivity based method for forecasting cost & time of earthmoving operations using sampling GPS data
ITcon Vol. 21, pg. 39-56, http://www.itcon.org/2016/3
2014 Ibrahim M, Moselhi O
Automated productivity assessment of earthmoving operations
ITcon Vol. 19, pg. 169-184, http://www.itcon.org/2014/9
2014 Montaser A, Moselhi O
Truck+ for earthmoving operations
ITcon Vol. 19, pg. 412-433, http://www.itcon.org/2014/25
2014 El-Sawah H, Moselhi O
Comparative study in the use of neural networks for order of magnitude cost estimating in construction
ITcon Vol. 19, pg. 462-473, http://www.itcon.org/2014/27
2013 Moselhi O, Alshibani A
Schedule compression using fuzzy set theory and contractors judgment
ITcon Vol. 18, pg. 64-75, http://www.itcon.org/2013/4
2007 Moselhi M and Alshibani A
Crew optimization in planning and control of earthmoving operations using spatial technologies
ITcon Vol. 12, pg. 121-137, http://www.itcon.org/2007/7